757 Coastal
Scope of Work & Estimate
406 Galveston Ct · Hampton, VA
406 Galveston Ct — kitchen floor
$1,462.50 Estimate
406 Galveston Ct · Hampton, VA
View PDF Accept & Pay Deposit Estimate valid until 09/10/2026
Project Overview
Customer: Charles Quigley
Project: Kitchen Floor Replacement
Address: 406 Galveston Ct, Hampton, VA
Existing floor: Ceramic tile over backer board
New floor: Cork-backed LVP (customer's selection at Floor & Decor)
Cabinets: Stay in place — floor work goes around them
Included Scope
10100General Conditions & Management$150.00
  • Jobsite protection and daily clean-up
  • Coordination of the demo, leveling and flooring sequence
10101Demolition & Debris Removal — Tile + Backer Board, Kitchen (120 sq ft)$250.00
  • Remove the existing ceramic tile and old backer board down to the subfloor
  • Thinset / mortar abatement after the tile is up
  • Debris removal and haul-off of the old tile, backer board and job debris
10117Subfloor Leveling — Sag Zone Under Refrigerator$200.00
  • Level the low/sagging zone under the refrigerator (floor leveler or plywood)
  • Final method and exact extent confirmed once the tile is up and the subfloor is exposed
10117Luxury Vinyl Plank — Supply & Install (120 sq ft)$600.00
  • Cork-backed LVP, customer's color selection at Floor & Decor
  • Material allowed at the $2.00/sq ft budget — a higher-priced selection is billed as the difference
  • Professional installation over the leveled subfloor
10117Long Transition — Kitchen Doorway (~10 ft)$100.00
  • One long T-mold / reducer where the new LVP meets the adjacent flooring
10117Shoe Molding / Quarter-Round (~25 linear ft)$62.50
  • New shoe molding / quarter-round where the floor meets the baseboard
  • Primed and painted to match the existing trim — painting included in this line
10117Appliance Resets — Refrigerator & Dishwasher$100.00
  • Refrigerator and dishwasher carefully pulled out for the floor work, then reset in place
  • Dishwasher is moved, not replaced
  • Floor register reinstalled as-is
Site Photos
Payment Schedule — 50 / 50
Deposit — to Schedule
50%
$731.25 upon signing
Final — on Completion
50%
$731.25 upon completion
Itemized Estimate
10100 — General Conditions & Management$150.00
10101 — Demolition & Debris Removal — Tile + Backer Board (120 sq ft), Haul-Off$250.00
10117 — Subfloor Leveling — Sag Zone$200.00
10117 — LVP Supply & Install (120 sq ft)$600.00
10117 — Long Transition (~10 ft)$100.00
10117 — Shoe Molding / Quarter-Round, Painted to Match (25 lf)$62.50
10117 — Appliance Resets (Fridge + Dishwasher)$100.00
GRAND TOTAL$1,462.50
Terms & Conditions

By agreeing to these Terms and Conditions, the customer acknowledges and accepts the outlined responsibilities and scope of work.

Scope: General conditions for the small job (jobsite protection, daily clean-up, coordination). Remove the ceramic tile and backer board in the kitchen (120 sq ft) and level the sag zone under the refrigerator (floor leveler or plywood — method and extent confirmed once the tile is up). Supply and install cork-backed waterproof LVP in the kitchen (120 sq ft) at the $2.00/sq ft material budget; a higher-priced selection at Floor & Decor is billed as the difference. Install one long transition at the kitchen doorway (~10 ft) and quarter round / shoe molding where baseboards are covered, primed and painted to match. Refrigerator and dishwasher are moved out and reset; the floor register is reinstalled as-is.

Not included: Carpet in the other rooms (planned separately — "one floor at a time"), cabinet / countertop / sink work (they stay in place), structural or crawlspace work (crawlspace already inspected and verified), new tile, plumbing or electrical changes, moving furniture or personal items beyond the refrigerator and dishwasher, and work outside the kitchen.

Contractor supplies: LVP flooring at the $2.00/sq ft budget allowance, floor leveler / plywood, transition molding, quarter round / shoe molding and paint to match, fasteners and adhesives.

Notes:
**Jobsite will be left clean once completed.

**Refrigerator and dishwasher are moved and reset by the contractor; the contractor is not responsible for pre-existing appliance conditions.

Warranty:
**12 months workmanship.

Payment Terms:
· Total Project Cost: $1,462.50
· Deposit to Schedule: $731.25 — pay online with the Accept & Pay Deposit button above (credit card)
· Final Payment: $731.25 — due upon completion

Check is a preferred method.
**You can pay by credit card using the link below.
https://request.plastiq.com/pay-tidewater-home-improvement-llc
Cards not eligible for payment: Virtual Affirm credit card

Validity: valid until September 10, 2026 (one week from the estimate date).